Milk and Yoghurt Production Line:
1. Yogurt production line is combined with milk storage tank, milk pre-heating tank, milk homogenizer, milk pasteurizer, milk fermentation tank and yogurt filling machine.
2. The whole processing from first step to final yogurt, it takes about 6-8 hours.
3. All of the tanks is made of food grade stainless steel and we promise the quality for 1 year.
The milk production line meets the standards for dairy processing equipment and is hygienic and safe. The machine is made of 304 stainless steel, which is easy to operate and easy to use, effectively improving the processing efficiency and the quality of dairy products. The machine is easy to clean.
Complete process:
Raw material storage (refrigeration tank) — filtration (pipeline filtration) —heating (preheating tank) —homogenization (homogenizer) —sterilization (sterilization tank) —fermentation (fermentation tank) —packing (packaging machine)
500l Milk and Yoghurt Line Equipment | 500l Milk and Yoghurt Line Equipment | ||
Equipment | Quantity | Equipment | Quantity |
200L refrigeration tank | 1 | 1000L refrigeration tank | 1 |
Single filter | 1 | Double filter | 1 |
200L preheating tank | 1 | 500L preheating tank | 1 |
500L Homogenizer | 1 | 500L Homogenizer | 1 |
200L sterilization tank | 1 | 500L sterilization tank | 1 |
200L Fermentation Tank | 1 | 500L Fermentation Tank | 1 |
Paper cup disc filling machine | 1 | Paper cup disc filling machine | 1 |
300L CIP cleaning | 1 | 500L CIP cleaning | 1 |
pump*4 | 4 | pump*4 | 4 |
Pipes, quick connections, valves, bases | 1 | Pipes, quick connections, valves, bases | 1 |